Kouhrang HEPP
Kouhrang HEPP
General Information
  Location : Chaharmahal-e-Bakhtiary province, Shahr-e-kord, chelgered by the Kouhrang No. 2 Diversion Tunnel
  Client : Iran Water & Power Resources Dev. Co.
  Consultant : Moshanir Co.
 
POWER HOUSE SPECIFICATION
  Type of Power House : Surface
  Capacity : 39.3 MW (3 units of 13.1 MW)
  Average Annual Power Generation : 128 million Kwh
 
SPECIFICATION OF MAIN EQUIPMENT
  Turbines : 3 Units Vertical Francis Turbines, with an approx. weight of 30 tons each
  Speed : 500 rpm
  Transformers : 2 Units Three phase Step-up 25 MVA, with an approx. weight of 36 tons each
  Generators : 3 units Generators, with an approx. weight of 50 tons each
 