Kouhrang HEPP  |
|
 |
| General Information |
|
| |
Location : |
Chaharmahal-e-Bakhtiary province, Shahr-e-kord, chelgered by the Kouhrang No. 2 Diversion Tunnel |
| |
Client : |
Iran Water & Power Resources Dev. Co. |
| |
Consultant : |
Moshanir Co. |
|
| |
| POWER HOUSE SPECIFICATION |
|
| |
Type of Power House : |
Surface |
| |
Capacity : |
39.3 MW (3 units of 13.1 MW) |
| |
Average Annual Power Generation : |
128 million Kwh |
|
| |
| SPECIFICATION OF MAIN EQUIPMENT |
|
| |
Turbines : |
3 Units Vertical Francis Turbines, with an approx. weight of 30 tons each |
| |
Speed : |
500 rpm |
| |
Transformers : |
2 Units Three phase Step-up 25 MVA, with an approx. weight of 36 tons each |
| |
Generators : |
3 units Generators, with an approx. weight of 50 tons each |
|
| |