Masjed-E- Soleyman HEPP  |
|
 |
| General Information |
|
| |
Location : |
Khuzestan Province - 25 Kilometers North-East of Masjed-e- Soleyman City - on Karun river |
| |
Client : |
Iran Water & Power Resources Dev. Co. |
| |
Consultant : |
Association of Moshanir, Nippon Koei and Lahmeyer Int. |
|
| |
| DAM SPECIFICATION |
|
| |
Type of Dam : |
Rockfill with central clay core |
| |
Height : |
177 m |
| |
Crest length : |
480 m |
| |
Crest Width : |
15 m |
| |
Type of spillway : |
Gated Spillway weir with aerated chute and stilling basin |
| |
Volume of reservoir : |
228 million m3 |
|
| |
| POWER HOUSE SPECIFICATION |
|
| |
Type of Power House : |
Underground |
| |
Capacity : |
1000 MW (4 units of 250 MW) |
| |
Average Annual Power Generation : |
3700 million Kwh |
|
| |
| SPECIFICATION OF MAIN EQUIPMENT |
|
| |
Turbines : |
4 x 254 MW, Vertical Francis, 700 tons each |
| |
Speed : |
187.5 rpm |
| |
Generator Busducts : |
4 units Insulated Phase Busducts, 15.75 KV and 11.5 KA |
| |
Butterfly Valves : |
4 units, with inner outlet diameters of 5.3 m and approximate weight of 272 tons each |
| |
Governors : |
4 units digital type with digital back-up Governors |
| |
Transformers : |
13 x 94 MVA Unit single phase with an approx. weight of 100 tons each |
| |
Flap Gates : |
4 Units Gates with Steel Lining and an approx. dimension of 8 x 5.9 m operating with two Hydraulic Servomotors (approx. weight of 37 tons each) and an approx. water pressure of 60.8m |
| |
Generators : |
4 x 250 MW, 15.75 KV, Vertical shaft with an approx. weight of 950 tons each |
| |
SF6 Switchgears : |
2 x 400 KV three phase circuits |
|
| |