Karun1 HEPP
Karun1 HEPP
General Information
  Location : Khuzestan Province - 50 Kilometers North-East of Masjed-e- Soleyman City - on Karun river
  Client : Khuzestan Water & Power Authority
  Consultant : Moshanir Co.
 
DAM SPECIFICATION
  Type of Dam : Concrete Arch Dam
  Height : 203 m
  Crest length : 383 m
  Crest Width :
  Foundation width : 36.5 m
  Area of reservoir : 55 Km2
  Type of spillway : Gated Chute Spillway
  Volume of reservoir : 3000 million m3
 
POWER HOUSE SPECIFICATION
  Type of Power House : Underground
  Capacity : 1000 MW (4 units of 250 MW)
  Average Annual Power Generation : 4000 million Kwh
 
SPECIFICATION OF MAIN EQUIPMENT
  Turbines : 4 x 254 MW Vertical Francis Turbines, with an approx. weight of 650 tons each
  Speed : 187.5 rpm
  Butterfly Valves : 4 Butterfly valves with an approx. weight of 200 tons each
  Governors : 4 units digital type with digital back-up Governors
  Transformers : 13 Single Phase Set-Up Transformers 100 MVA, 15.75/400 KV with an approx. weight of 110 tons each
  Hydraulic steel structure : Gates, Penstocks, Steel Linings, Trashracks and related equipment
  Cranes : Two Power House cavern overhead Cranes with a total lifting capacity of 2 x 320 tons
  Generators : 4 x 250 MW Generators with an approx. weight of 1200 tons each
 