Karkheh HEPP  |
|
 |
| General Information |
|
| |
Location : |
Khuzestan Province - 20 Kilometers North-West of Andimeshk City - on Karkheh river |
| |
Client : |
Iran Water & Power Resources Dev. Co. |
| |
Consultant : |
Mahab Ghods Consulting Engineers Co. |
|
| |
| DAM SPECIFICATION |
|
| |
Type of Dam : |
Earthfill with Clay Core |
| |
Height : |
127 m from foundation |
| |
Crest length : |
3030 m |
| |
Crest Width : |
12 m |
| |
Foundation width : |
1100 m |
| |
Type of spillway : |
Ogee type |
| |
Volume of reservoir : |
7800 million m3 |
|
| |
| POWER HOUSE SPECIFICATION |
|
| |
Type of Power House : |
Surface |
| |
Capacity : |
400 MW (3 units of 133.3 MW) |
| |
Average Annual Power Generation : |
934 million Kwh |
|
| |
| SPECIFICATION OF MAIN EQUIPMENT |
|
| |
Turbines : |
3 x 133.3MW, vertical Francis Turbines, with an approx. weight of 560 tons each |
| |
Speed : |
155 rpm |
| |
Butterfly Valves : |
3 Butterfly valves with an approx. weight of 223 tons each |
| |
Governors : |
3 units digital type with digital back-up Governors |
| |
Transformers : |
3 Units, three phase Step Up Transformers 160 MVA with an approx. weight of 147 tons each |
| |
Hydraulic steel structure : |
Stoplog Gates of Draft Tube |
| |
Cranes : |
Two Power House main Cranes each with a lifting capacity of 225 tones |
| |
Generators : |
3 Generators with an approx. weight of 775 tons each |
|
| |