Nar Gas Compressor Station  |
|
| |
|
|
| |
 |
|
| |
General Information |
|
|
|
|
| |
| |
Location : |
Nar Region, Jam City, Boushehr Province |
| |
Client : |
Iranian Central Oil Field Co. (affiliated to NIOC) |
| |
Contractors : |
FARAB Co. |
| |
Type of Contract : |
E. P. C. |
| |
Contract Duration : |
26 months |
|
|
| |
|
|
| |
Specification |
|
|
|
|
| |
| |
Turbine Type : Cyclone SGT-400 Siemens
Design Pressure : 1450 PSIA
Maximum Compressor Discharge Pressure : 1311 PS
ISO Rating : 1311 PSIA
Synchronous Speed : 9500 rpm
Maximum Station Gas Discharge : 36.2 mmscmd
Compressor Trains Quantity : 4
Pipelines : 11 Km |
| |
|
|
|
| |
|
|
|
|
| |
|
|