Top Banner  
Viollert Left   Persian   Viollet Right
 
speacer
  Home
speacer
speacer
  About FARAB
speacer
speacer
  Projects & Services
speacer
speacer
  News & Events
speacer
speacer
  Careers
speacer
speacer
  Useful Links
speacer
speacer
  Site Map
speacer
speacer
  Contact Us
speacer
 
speacer  
  Nar Gas Compressor Station  
 
Nar Gas Compressor Station
 
   
  General Information  
 
  Location : Nar Region, Jam City, Boushehr Province
  Client : Iranian Central Oil Field Co. (affiliated to NIOC)
  Contractors : FARAB Co.
  Type of Contract : E. P. C.
  Contract Duration : 26 months
 
     
  Specification  
 
  Turbine Type : Cyclone SGT-400 Siemens

Design Pressure : 1450 PSIA

Maximum Compressor Discharge Pressure : 1311 PS

ISO Rating : 1311 PSIA

Synchronous Speed : 9500 rpm

Maximum Station Gas Discharge : 36.2 mmscmd

Compressor Trains Quantity : 4

Pipelines : 11 Km
   
 
     
  Useful Links Site Map Contact Us Mailbox
 
 
© Copyright Farab Co. 2005 - All rights reserved.