Khoramabad Gas Turbine Power Plant (B. O. O.)  |
|
| |
|
|
| |
 |
|
| |
General Information |
|
|
|
|
| |
| |
Location : |
IRAN, Lorestan Province, Khoramabad City |
| |
Project Company : |
Khoramabad Power Generation Co. |
| |
Power Plant Type : |
Gas Turbine extendable to Combined Cycle |
| |
Constraction Period : |
40 months |
|
|
| |
|
|
| |
Main Specification |
|
|
|
|
| |
| |
Investor : Farab / Saba / Sana
Site Conditions : Altitude : 1270 m.a.s.l / Ambient Temp: 15.8°C / Relative humidity: 47%
Grid Voltage : 400 KV & 230 KV
Power plant Type : Gas Turbine extendable to Combined Cycle
Fuel Type : Natural Gas
Power plant Capacity at ISO conditions : 1296 MW (8 x 162 MW)
Construction Period : 40 Months |
|
|
| |
|
|
|
|
| |
|
|